28 May 2022

London Underground: Why the Northern line was designed in such a random way with branches going off all over the place - MyLondon

London Underground: Why the Northern line was designed in such a random way with branches going off all over the place - MyLondon
... In 1913 owner of CCE&HR, Underground Electric Railways Company of London, took over the C&SLR eventually integrating them into one line in the 1920s, first by joining up stations at Camden Town and Euston, before connecting more parts of the lines including Kennington in 1926. ...

No comments: